Home

ESF News

Projects

Personnel

Electrical Design

Mechanical Design

Machine Shop

Mechanical
Designs

Links

ESF Location

Past Issues of ESF News

 

ESF News

Monday, December 1, 2008

ALOHA Cabled Observatory Deployment Encounters Problem

The ACO (ALOHA Cabled Observatory) experienced fiber-optic attenuation and connectivity problems. The these problems are in the process of being resolved and we hope to redeploy the ACO in the near future. Rough weather also prevented the redeployment of the ALOHA Proof module, as a result we have lost our real-time audio feed.

 

 

 Past Issues

Page Last Modified 12/02/2008

 

This site maintained by Bill Doi

Copyright © 2005  [SOEST/ESF]. All rights reserved.