Date   KDRT                      
1st used   NUKOLII BEACH 2/13/2006 8/18/2006 2/10/2007 2/11/2007 2/12/2007            
2/13/2006 RP#1 PK ~0.5m up base of naupaka BRP BRP BRP BRP BRP            
2/13/2006 RP#2 "x" divot on low lying boulder just makai of dirt rd.  FRP FRP FRP FRP FRP            
2/13/2006 RP#3 PK~1M UP  IRONWOOD  SRP                    
  RP#4                         
  RP#5                        
  RP#6                        
  RP#7                         
  RP#8                        
  RP#9                        
  RP#10                        
  Start of Line BRP BRP BRP BRP BRP          
  bearing 80 84 88 85 86            
     
LOCATION:                          
LINE-UP                      
RP#1 PK ~0.5m up base of naupaka                        
RP#2 "x" divot on low lying boulder just makai of dirt rd.                         
RP#3 PK~1M UP  IRONWOOD 2ND IN FRO OPENING OF RD ON S. SIDE                        
RP#4                          
RP#5                          
RP#6                          
RP#7                          
RP#8                          
RP#9                          
GPS                          
GPS                          
GPS                          
GPS                          
                           
NOTES:                          
2/13/2006 GPS points for the RP's at this time are taken only with hand held unit errors ranging from 8-20m  
                           
                           
                           
                           
   
  GPS Positions Latitude Longitude Elevation (meters above local tidal datum)  
   
   
   
  *Primary GPS for elevation control;  
  **Primary reference point    
  ***Primary reference point    
                           
OCEM GPS X(m) Y(m) Z(m) Z(m-LT) Date Surveyed COMMENTS
RP#1 0 0 0 2/13/2006 need new BRP/RP2/tree is rotting 8/14/07
RP#2 16.085 0.000 -0.366 2/13/2006
RP#3 27.155 22.345 0.366 2/13/2006
RP#4
RP#5
RP#6
RP#7
RP#8
RP#9