| Date |
|
KANI |
|
|
|
|
|
|
|
|
|
|
|
| 1st used |
|
ANINI BEACH |
2/6/2006 |
8/19/2006 |
2/11/2007 |
8/14/2007 |
2/5/2008 |
|
|
|
|
|
|
| 2/6/2006 |
RP#1 |
PK in S. side of large ironwood near
N. end of park in grass 1.2m up |
brp |
BRP |
BRP |
BRP |
BRP |
|
|
|
|
|
|
| 2/6/2006 |
RP#2 |
PK in S. side of smaller, leaning ironwood close to VL. |
frp |
FRP |
FRP |
FRP |
FRP |
|
|
|
|
|
|
| 2/6/2006 |
RP#3 |
base of W. roadside corner of washrooms |
srp |
SRP |
SRP |
|
|
|
|
|
|
|
|
| 2/6/2006 |
RP#4 |
PK in swd side of tel. Pole just above 37 |
srp |
|
|
|
|
|
|
|
|
|
|
| |
RP#5 |
|
|
|
|
|
|
|
|
|
|
|
|
| |
RP#6 |
|
|
|
|
|
|
|
|
|
|
|
|
| |
RP#7 |
|
|
|
|
|
|
|
|
|
|
|
|
| |
RP#8 |
|
|
|
|
|
|
|
|
|
|
|
|
| |
RP#9 |
|
|
|
|
|
|
|
|
|
|
|
|
| |
RP#10 |
|
|
|
|
|
|
|
|
|
|
|
|
| |
Start
of Line |
brp.by |
brp |
brp |
brp |
brp |
|
|
|
|
|
|
| |
bearing |
10° |
10° |
5° |
5° |
5° |
|
|
|
|
|
|
| |
|
|
|
|
| LOCATION: |
|
|
|
|
|
|
|
|
|
|
|
|
|
| LINE-UP |
|
|
|
|
|
|
|
|
|
|
|
|
| RP#1 |
PK in E.
side of large ironwood near N. end of park in grass 1.2m up |
|
|
|
|
|
|
|
|
|
|
|
|
| RP#2 |
PK 1m up
on lndwd side of smaller, leaning ironwood close to VL. |
|
|
|
|
|
|
|
|
|
|
|
|
| RP#3 |
base of W.
roadside corner of washrooms |
|
|
|
|
|
|
|
|
|
|
|
|
| RP#4 |
PK in swd
side of tel. Pole just above 37 |
|
|
|
|
|
|
|
|
|
|
|
|
| RP#5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
| RP#6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
| RP#7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
| RP#8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
| RP#9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
| GPS |
|
|
|
|
|
|
|
|
|
|
|
|
|
| GPS |
|
|
|
|
|
|
|
|
|
|
|
|
|
| GPS |
|
|
|
|
|
|
|
|
|
|
|
|
|
| GPS |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| NOTES: |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2/6/2006 |
GPS points
for the RP's at this time are taken only with hand held unit errors ranging
from 8-20m |
|
|
| 1/23/2006 |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
| |
GPS Positions |
Longitude |
Elevation (meters above local tidal
datum) |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
*Primary GPS for elevation control; |
|
|
| |
**Primary reference point |
|
|
| |
***Primary reference point |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
X(m) |
Y(m) |
Z(m) |
Z(m-LT) |
Date Surveyed |
|
|
RP#1 |
|
|
RP#2 |
|
|
RP#3 |
|
|
RP#4 |
|
|
|
|
RP#5 |
|
|
|
|
RP#6 |
|
|
RP#7 |
|
|
|
|
RP#8 |
|
|
|
|
RP#9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|