6 April

96Position4-6.jpg (63725 bytes) Module 4/6 has landed on the ways. Note the spacer beams that AMI has installed between the hulls to ensure that spacing is maintained during assembly.

23 March

82hpr418Vlv.jpg (64071 bytes) The foot valve and hull penetration for the HPR 418 are fitted into the pump room. The 418 will be set atop the valve, after the production welding is complete.

16 March

75Mod4-6.jpg (56542 bytes) After AMI installed the last side shell on Module 4-6, they put a canvas cover over the pump and sonar room, which was promptly ripped off by a storm that passed over the area the next day.

75Mod6pmpRm.jpg (74484 bytes) The pump room has a lot of equipment and piping left to install before it is ready to go to the paint shop. We are also having a problem with keeping the area and piping clean.

9 March

68Mod6Sonar EM500.jpg (45053 bytes) The inserts in the base-plate for the EM 500. AMI has not cut the opening for the ADCP as of Friday.

2 March

61Mod4-6.jpg (44964 bytes) The last frames have been installed on modules 4 and 6. 

61Mod4-6shell.jpg (43851 bytes) Hanging the first side-shell on module 4 and 6. 

25 February

54Mod4-6wo sonarframes.jpg (39003 bytes) Continue to assemble frames into module 4 and 6, which are being worked together.

54sonarfrm not installed.jpg (54883 bytes) The sonar frame boxes have not been installed at this time. (As of Fri. p.m.)

20 February

51mod4-6.jpg (50130 bytes) Module 6 is joined to module 4 to complete assembly as a joined unit..

16 February

47Mod6WMotorSonar.jpg (80885 bytes) Main motor foundation.

47Mod6 AssemStarted.jpg (89621 bytes) Assembly started on module 6.

47Xtranpines in    box.jpg (59760 bytes) The leveling pins for the sonar frame.

47XtrnInBox.jpg (85262 bytes) Starting to fit the sonar frame into box that is part of the foundation for the module

3rd Platform, Home

4/6/01