16 February 2001

47Mod3PipReplaced.jpg (55894 bytes) The piping in the module has been replaced to meet the material requirements.

31 JANUARY 2001

2-1Mod3overview.jpg (86797 bytes) Module 3 moved into final assembly area, and being prepared for ABS inspections.

27 JANUARY 2001

OutfitingMod3.jpg (67818 bytes) Piping and ladders installed as part of outfitting.

Mod3 taking shape.jpg (74709 bytes) Module 3 taking shape.

23 JANUARY 2001

Mod3Lview1-23-01.jpg (83297 bytes) A long range shot of module 3. It is about as big as can be fitted in bay 1

Mod3side CLw-sif1=23-01.jpg (74149 bytes) The stiffeners are installed on side shell prior to being fitted up to frames

Mod3MarkFrm1-23-01.jpg (48247 bytes) Note the cuts in the frames in preparation for pipe runs, and the size of the keel beams

Mod3 frmB1-23-01.jpg (56498 bytes) Frames in place for module 3

Mod3xtrrcut1-23-01.jpg (61639 bytes) A cut in the keel plate in preparation for installation of transducer tube

SidePLT1-23-01.jpg (76852 bytes) The side shell in a welding gig prior to fitting up to frames on module 3

19 JANUARY 2001

Mod 3 keel 1-19-01.jpg (95830 bytes) The keel and base plate for module 3 are being assembled in the shop.Vert-Frame assemMod3-1-19-01.jpg (64385 bytes) The vertical frames for module 3 are being assembled. Steve Madden is the person in this picture.

Part marking1-19-01.jpg (50052 bytes) Each part that is cut is also marked off the NC tape to insure that it can be tracked.

Plat line install stiff1-19-01.jpg (59713 bytes) Stiffeners are added on the plate line