19 October

293Mod2A.jpg (67543 bytes)

5 October

279Mod2FinA.jpg (68153 bytes)

28 September

272EM1002A.jpg (79097 bytes)

21 September

265CannardE.jpg (74122 bytes) 265CannardD.jpg (41262 bytes)

265EM1002base.jpg (71103 bytes) 265EM1002B.jpg (91836 bytes)

6 June

161Mod2c.jpg (47662 bytes) 161Mod2d.jpg (48045 bytes)

161Mod2g.jpg (60237 bytes) 161Mod2h.jpg (63336 bytes)

18 May

138mod2a.jpg (71816 bytes) 138Mod2b.jpg (90449 bytes) 

16 March

75Mod2Bowdetail.jpg (61083 bytes) The bow section of module 2 requires shaped plates.

75Mod2shapplt.jpg (81003 bytes) The formed plates for this module are finally taking shape. This is the fourth effort to get the shapes right, but it looks like they have come up with a good procedure, with the help of an adviser from Todd.

9 March

68mod2SeamB.jpg (56831 bytes) The fit-up of shell plates does not meet correctly.

68Mod2seamC.jpg (68777 bytes) This is a a picture of both the seam fit-up problems, but also shows the close framing required for the ice belt.

68Mod2 insert.jpg (63488 bytes) Insert has been installed to fix the fit-up problem. This was done to both the inboard and outboard sides of this module.

2 March

61Mod2B.jpg (88980 bytes) Module is ready for side-shell application.

23 February

54BowformAft.jpg (55751 bytes) Module 2 bow section continues to be assembled.

20 February

51mod2.jpg (91467 bytes) Assembly has started on module 2.

3 rd Platform, Home

10/21/01