9 November
28 September
19 May
Module 1 is landed on the building ways.
12 May
Preparations have been made to land module 1 on
the ways. This module should land next this coming week.
5 May
Work continues in preparation to move this module to the ways.
20 April
Module 1 is taking shape nicely. The inlet for the bow thruster is the opening
you see in the side.
13 April
The shaped sections on this module are turning
out well. The making of these shapes is quite an art if done freehand.
6 April
The first trial fit-up of the bow thruster was
made this week.
The bow shapes and cap are being installed on
module 1.
30 March
The foundation for the bow-thruster is being
prepared for landing the unit.
23 March
Shop assembly has started in the shop for the
last module in the lower hulls.
9 March
The bow thruster with the turning gear and bottom plate visible. The person in
the picture is Shawn Izenson.
11/11/01