22 August
20 April
Module 8 B came together this week in preparation
for landing.
13 April
The assembly of 8B has started. The design of
this unit is a good example of the effort to reduce weight. It is impressive to
see the work that AMI is doing.
The bird in this picture is very possessive of
this module.
6 April
Module 8A was landed on the ways.
16 March
The base plate for module 8 has landed in the assembly area.
8/26/01