26 October
17 August
13 April
Module 7B is set on the ways. This will free up
space for the assembly of 8B.
6 April
Module 7B is being prepared to land. Then the cut
will be made in the side for the fin. (Where you see the current space in the
shell.)
30 March
The shaft bearing is being fit-up to the foundation for the shaft. Note the open
space we will have in the lower hulls.
23 March
In the shaft alley, we will have a very open work area if we need to work on the
shaft bearing. The framing you see in this picture is for the working deck
around the shaft bearing.
The stern section of module 7 is taking shape in
preparation for the assembly, which will join it to the rest of the module after
the two sections are moved outside.
A view of the area being prepared for the stern
tube and seal.
9 March
Framing continues around the shaft line. (Nothing special about this picture...I
just like it!)
2 March
Assembling of shaft alley has started.
Sections of the module are being assembled.
The base plate is started being assembled.
10/28/01