18 July
27 June
22 June
15 June
9 June
2 June
Assembly of module 23 continues.
25 May
The sections of module 23 came out of the shop so
that assembly could be completed.
19 May
12 May
Assembly on the haunch section of module 23
continues.
4 May
This is the start of the assembly in the haunch area. As a reference, this is a
bulkhead one would find at the end of a store room (upside down.)
Piping is being installed in the module as it is being assembled.
The transformers have arrived in the shipyard. The second picture is of the bus
work in the units.
27 April
The framing between the wet deck and the main deck is taking shape.
7/22/01