21 June
Module 19 Starboard landed on 6-21-01.
2 June
Module 19 starboard has been turned over to
complete down hand welding prior to landing.
18 May
Modules, 11-13, are being landed as a combined
unit.
5 May
27 April
Module 15-17 is being rolled 90 degrees so that it can be welded down-hand.
20 April
The column modules for the starboard side are coming along, and next week they
will be split into two sections and turned over to complete production welding
prior to landing.
Module 19 is being assembled in the shop.
16 March
Assembly of module 15 has started in the foreground. It will take on the same
shape as module 13, which is in the background.
9 March
The module in the center of the picture is #13 which is being assembled on its
side. The piece of steel that you see above the ladder is one of the inserts
which makes this unit difficult to assemble.
2 March
Assembly has started on module 13
Assembly continues on modules 13 and 15. These modules are being assembled on
their side.
26 February
The jig that will be used for modules 13 and 15 is setup on the building flats.
Modules 13 and 15 will be assembled as a single unit. Modules 14 and 16 will use
the same jig.
6/23/01