21 June

174Mod19sE.jpg (54048 bytes) Module 19 Starboard landed on 6-21-01.

174Mod19sB.jpg (66691 bytes) 174Mod19sD.jpg (60581 bytes)

2 June

160Mod19S.jpg (73190 bytes) Module 19 starboard has been turned over to complete down hand welding prior to landing.

18 May

138mod11-13c.jpg (54772 bytes) 138mod11-13h.jpg (60232 bytes) Modules, 11-13, are being landed as a combined unit.

5 May

124mod15-17c.jpg (54881 bytes)

124mod15-17b.jpg (45435 bytes) 124mod15-17a.jpg (42340 bytes)

27 April

117mod15-17rollC.jpg (49835 bytes) Module 15-17 is being rolled 90 degrees so that it can be welded down-hand.

20 April

110Clm11-19a.jpg (79135 bytes) The column modules for the starboard side are coming along, and next week they will be split into two sections and turned over to complete production welding prior to landing.

110Mod19.jpg (74439 bytes) Module 19 is being assembled in the shop.

16 March

75Mod15.jpg (61102 bytes) Assembly of module 15 has started in the foreground. It will take on the same shape as module 13, which is in the background.

9 March

68Mod13 insertplates.jpg (49234 bytes) The module in the center of the picture is #13 which is being assembled on its side. The piece of steel that you see above the ladder is one of the inserts which makes this unit difficult to assemble.

2 March

61Mod13assem.jpg (64417 bytes) Assembly has started on module 13

61Mod13FrmB.jpg (55889 bytes) Assembly continues on modules 13 and 15. These modules are being assembled on their side.

26 February

61Frm13-15.jpg (54448 bytes) The jig that will be used for modules 13 and 15 is setup on the building flats. Modules 13 and 15 will be assembled as a single unit. Modules 14 and 16 will use the same jig.

Home 3rd Platform

6/23/01