|
Primary Production and Sediment
Trap Arrays
In order to run a Primary Production experiment, we will have to collect
water at various depths from a CTD cast. This water is then incubated
at the same eight depths from which they are collected by deploying
them on our Primary Production array. We will let the array drift
free during a full daylight period.

Recovery of free drifting sediment trap
Now that we have recovered the Primary Production array and have
picked up the sediment traps, we can continue to our next station.
|