HOT-4 Cruise Report SSP Kaimalino 24-28 Feb. 1989 Personnel List: --------------- Steve Chiswell Chief Scientist Chris Winn Senior Scientist Dave Bird Scientist Jim Harkness Winch Operator Dale Hebel Scientist George Parish Scientist Stewart Reid Scientist Marc Rosen Deck Operations Jef Snyder Electronics Technician Dave Karl Senior Scientist Itinerary (approximate local time): ----------------------------------- 24 Feb. 0600 Depart Snug Harbor 0900 Arrive Kahe Pt for two test casts 1200 Depart Kahe Pt 25 Feb. 0200 Arrive HOT-site: deploy sediment traps 0500 Commence 3-hourly CTD casts 27 Feb. 1600 Recover Sediment traps 1900 Depart HOT site 28 Feb. 1200 Arrive Snug Harbor Narrative: ---------- HOT-4 was the first cruise on the SSP KAIMALINO. The cruise was initially delayed for one day because the electric current required to start the hydrographic winch was more than the KAIMALINO's breaker-box could supply. The self-starter on the winch was eventually bypassed, and the rest of the cruise was nominal.
Return to Cruise Summaries. (No tables)
Last modified: January 00, 1998