FIGURE 3. Cruise track map of the EQ-3 cruise on the R/V Moana Wave (Leg 1: April 11-25, 1994. Leg2: April 25-May 11, 1994). The locations of CTD stations, ATLAS and current meter mooring and free rising profiler measurements (FRP) are shown. The thick lines along the cruise track indicate locations where bow-sensor measurements were made.